Thursday 9 August 2012

EGR blanking !!!

Tools required for this job
1) L- box lever and  100 mm extender
2) No 14 box  
3)  Ring spanner . NO 14 (bothside Ring)
4) Common Ring No.14
5) Gardening gloves
6) WD40 0r similar 

To my recommendation , the best time to do this is just after some normal driving, wait about 10 minutes . Do take precaution as all part are very hot, wear gloves to prevent being burnt.
Start with the nut on exhaust manifold side.  Before attempting to open give it a few shots of WD40. This will cool down the whole nut and stud. The cooling effect will cause the nut and stud to shrink  making it easier to remove. When you turn chances are the whole stud and nut will come out together .


This is hole will nicely fit the extender and L handle
There is a hole that will snuggly fit the No 14 box and extender

 

 For the bottom screw . It can be reached with a ring spanner from the bottom. For those of you who did not lift their truck, use a floor jack and lift it a few inches for clearance


WHEN FITTING IN THE BLANKING PLATE ON THIS SIDE, PLACE THE GASKET IN FIRST THEN ONLY THE PLATE..to prevent leakage
Sequent  
1ST.. GASKET
2ND.. PLATE
 3RD .. EGR PIPE




On the other side of the EGR pipe is quite straight forward just remove the screws and fit in the plate before the gasket to prevent leakage . 
Sequent  
1st Gasket
2nd Plate
3rd EGR pipe





Tuesday 7 August 2012

Inner Guard scraping Solution



 This is before the inner guard is bent in























after you remove the mudguard and and inner guard u will see this
















bend up the metal sheet just after the screw  














 Cut along the edge with a sharp blade


Push in the inner guard till it can go in anymore and mark the protruding section

Fold in Along the marked line



Heating it with a heater gun will ease the folding process. Please wear gloves while folding


 after folding the inner guard


 Screw it in with self tapping screw to hold the inner guard